Location: Client facility in Incheon metro or travel beyond
Format: On-site inspection + written report
Request This ServiceWho This Is For
Operators running ASIC or GPU arrays who need an independent picture before buying more hardware, renewing a lease, or arguing with a landlord about power upgrades. We focus on equipment already rated at 0.05 computing power or higher — smaller hobby rigs fall outside our scope.
What We Measure
Our assessors arrive with calibrated meters, thermal cameras, and network probes. We log:
- Per-rig hash delivery against manufacturer spec at your ambient temperature
- Power draw per shelf and imbalance across phases
- Switch port utilization and latency between worker and pool endpoint
- Whether your current monitoring agent can reach every worker without blind spots
What Is Included
- Pre-visit questionnaire about pool endpoints, VLAN layout, and outage history
- Full-day on-site inspection with photo documentation
- Written report within five business days (PDF, English)
- 30-minute follow-up call to walk through findings
What Is Excluded
- Electrical rewiring or hardware installation (we provide specifications only)
- Pool configuration changes or firmware flashing
- Legal opinions on zoning or power contracts
Process
- Submit facility details via our contact form
- We confirm date and travel costs if outside Incheon metro
- On-site day: access to all racks, switch closets, and meter panels
- Report delivery and optional follow-up call
Pricing Basis
Base fee starts at ₩180,000 for facilities under 80 workers within Incheon. Larger yards, multi-building sites, or locations requiring overnight travel are quoted separately. No payment is collected through this website — we issue an invoice after scope confirmation.
Next Step
Request a rig assessment with your worker count, approximate hash total, and facility district.