On-Site Rig Assessment

A full-day walk-through of your mining facility measuring hash delivery, thermal load, and network readiness for rigs at 0.05 computing power and above.

On-Site Rig Assessment

Quote from ₩180,000 · 1 day on-site

Location: Client facility in Incheon metro or travel beyond

Format: On-site inspection + written report

Request This Service

Who This Is For

Operators running ASIC or GPU arrays who need an independent picture before buying more hardware, renewing a lease, or arguing with a landlord about power upgrades. We focus on equipment already rated at 0.05 computing power or higher — smaller hobby rigs fall outside our scope.

What We Measure

Our assessors arrive with calibrated meters, thermal cameras, and network probes. We log:

  • Per-rig hash delivery against manufacturer spec at your ambient temperature
  • Power draw per shelf and imbalance across phases
  • Switch port utilization and latency between worker and pool endpoint
  • Whether your current monitoring agent can reach every worker without blind spots

What Is Included

  • Pre-visit questionnaire about pool endpoints, VLAN layout, and outage history
  • Full-day on-site inspection with photo documentation
  • Written report within five business days (PDF, English)
  • 30-minute follow-up call to walk through findings

What Is Excluded

  • Electrical rewiring or hardware installation (we provide specifications only)
  • Pool configuration changes or firmware flashing
  • Legal opinions on zoning or power contracts

Process

  1. Submit facility details via our contact form
  2. We confirm date and travel costs if outside Incheon metro
  3. On-site day: access to all racks, switch closets, and meter panels
  4. Report delivery and optional follow-up call

Pricing Basis

Base fee starts at ₩180,000 for facilities under 80 workers within Incheon. Larger yards, multi-building sites, or locations requiring overnight travel are quoted separately. No payment is collected through this website — we issue an invoice after scope confirmation.

Next Step

Request a rig assessment with your worker count, approximate hash total, and facility district.